7500A Smart Primary Current Generator Challenges ?
According to industry reports, 85% of industrial and mining enterprises experience rework due to insufficient accuracy and poor stability of high-current testing equipment, resulting in direct annual losses exceeding 500,000 yuan. How can we resolve the safety and efficiency dilemma in high-current scenarios?
Three Major Issues Slowing Production Progress
1. Constant Safety Hazards
Traditional generators suffer from inadequate heat dissipation, triggering overheating and circuit breakers. Manual operation errors reach 23% (Source: Power Equipment Safety White Paper), causing data distortion at best and equipment failures at worst.
2. Persistently Declining Testing Efficiency
Enterprises often face the dilemma of "two hours of testing followed by a full day of debugging." A cable manufacturer reported that during 4000A temperature rise tests with outdated equipment, repeated recalibrations due to current fluctuations quadrupled the time per test.
3. Bulky Equipment Restricts Application Scenarios
Traditional split-type generators require three-person teams for relocation, significantly increasing switching costs between lab and field operations. One rail transit project experienced a 15-day schedule delay due to equipment deployment delays.

7500A Smart High-Current Generator Advantages Stand Out
▶ Safety Closed-Loop: Triple Protection System
Precise Current Control: ±1% FS high-precision output eliminates overcurrent damage to test equipment
Intelligent Fuse Protection: 0.02-second automatic shutdown for overcurrent/overheating/short circuits-5x faster response than conventional devices
Dual-Mode Cooling: Forced air cooling + temperature control system enables 7500A continuous output for 1 hour without attenuation
▶ Efficiency Leap: Intelligent Scenario Adaptation
One-Click Programmable Control: 8 preset templates (power/rail transit/lab) boost switching efficiency by 70%
Remote Collaboration: Real-time PC monitoring with multi-device networked synchronous testing
Mobile Deployment: Modular design + flight case packaging enables single-person site relocation in 3 minutes
▶ Long-Term Assurance: Full-Cycle Service Network
3-year extended warranty on key components; 48-hour on-site maintenance at 30 nationwide service centers
Custom fixture solutions for irregular component testing challenges
Welcome to visit our website:www.goldhomehipot.com







