Goldhome has dedicated itself to research and development, keeping pace with the times to design a gas transformer high-voltage testing system specifically for evaluating the insulation performance of electrical equipment such as cables, transformers, and switchgear. This 5kVA 100kV AC DC Hipot Tester with Inflatable Tester Gas Transformer features safety, reliability, powerful functionality...
Send Inquiry
Description
Technical Parameters
Wuhan Goldhome Hipot Electrical Co., Ltd. is one of the leading manufacturers and suppliers of 5kva 100kv ac dc hipot tester in China. With abundant experience, our factory offer high quality customized products made in China with competitive price. Welcome to contact us for quotation.
Products Video
Product Overview
Overview: Goldhome has dedicated itself to research and development, keeping pace with the times to design a gas transformer high-voltage testing system specifically for evaluating the insulation performance of electrical equipment such as cables, transformers, and switchgear. This 5kVA 100kV AC DC Hipot Tester with Inflatable Tester Gas Transformerfeatures safety, reliability, powerful functionality, user-friendly operation, and easy maintenance. It is primarily used for conducting withstand voltage tests on various electrical equipment, components, and insulating materials, assessing product insulation ratings, and detecting insulation defects in test subjects.
Features & Advantages
1.This inflatable test transformer has a small volume and light weight (40% -65% lighter than oil immersed test transformers of the same grade) 2.Clean, oil-free, no maintenance required. 3.Not affected by harsh weather conditions,on-site handling does not require standing still for testing 4.The insulation strength is significantly higher than that of oil immersed test transformers, andthe corona is extremely small.
Products Parameter
Capacity range:
5kVA-100kV
No load current:
<7%
lmpedance voltage
<8%
Type
AC, AC/DC, AC cascade, AC/DC cascade
Insulation medium
SF6 gas/sulfur hexafluoride
Low voltage current
0 ~ 250V
High-voltage current
0~ 50mA
High voltage
0 ~ 100kV
Voltage measurement accuracy
1.0 %FS ±3d
Current measurement accuracy
1.5%FS ±3 d
Time length
0 ~ 999 S(Special model can be used to work long hours)
Supply voltage
AC230V ±10%, 50Hz±2 Hz
Operating Steps
I.Test wiring diagram
I.Test Process:1.Connect wiring as shown in the diagram above. Check if the pressure gauge indicates normal internal gas pressure (≥0.3 MPa).2. Current-limiting resistor configuration: 0.3–1 ohm per volt for power frequency withstand voltage; generally unsuitable for routine testing.3. Remove test specimen lead wires. Clean contamination from bushings and core body; implement shielding measures if necessary.4. After completing preparations and safety measures, perform a no-load test on the equipment.5.Connect the test specimen.6.Turn on the power supply. The power indicator and zero position indicator on the control console (box) should illuminate.7.Press the start button. The start indicator should illuminate.8. Slowly and evenly rotate the voltage regulator knob clockwise while monitoring the voltmeter reading. Stop rotating when the rated voltage is reached.9. Closely observe the ammeter reading and withstand time.10. Upon reaching the withstand time, promptly rotate the voltage regulator knob rapidly and evenly in the opposite direction until it returns to zero.11. Test complete.
1. When arranging test equipment, ensure sufficient safety clearance around personnel. Avoid placing equipment and high-voltage leads in pedestrian walkways whenever possible.2. Install barriers at the test site and hang "Stop! High Voltage Danger" signs.3. During testing, high-voltage leads must be supported or guided by insulating materials. A safety supervisor must be present to prevent personnel from approaching or passing underneath.4. For withstand voltage tests, verify that equipment capacity is sufficient and avoid resonance.5. The working ground wire (high-voltage tail, grounding wire at the end of the voltage-stabilizing capacitor) and the protective ground wire (operating part casing) shall be connected separately and have good grounding performance.6. Irregular power fluctuations during testing (e.g., from welding) will inevitably affect the stability of the high-voltage output. In such cases, stop the test, identify the cause, and eliminate it.7. The climatic conditions (temperature, humidity) for testing shall comply with the requirements of the test procedures and shall be recorded.8. High-voltage testing must strictly adhere to relevant safety regulations issued by the Department of Energy.9. Test personnel must thoroughly review the instruction manual before testing to familiarize themselves with transformer test wiring methods.10. Prior to energizing the test, personnel must rigorously verify wiring connections between the control console (box), test transformer, and test specimen. Energization may proceed only after confirming all connections are correct.