Voltage Transformer Burden Load Box: VT/PT Secondary Load Testing and Performance Verification
1. Why Does a Voltage Transformer Need Burden Testing?
A voltage transformer (VT), also known as a potential transformer (PT), converts a high primary voltage into a standardized lower secondary voltage for metering, protection, and monitoring applications.
Its secondary winding supplies connected equipment such as:
Energy meters.
Voltage measuring instruments.
Protection relays.
Monitoring devices.
Control and indication circuits.
These connected devices create an electrical load on the VT secondary winding. This load is called the secondary burden and is normally expressed in volt-amperes (VA) at a specified power factor.
A Voltage Transformer Burden Load Box provides a controlled electrical load that can be connected to the secondary circuit to simulate different operating conditions.
By applying selected burden values, engineers can evaluate the behavior of the secondary circuit and verify whether the VT is operating within its specified burden conditions.
Burden testing is particularly relevant during instrument transformer manufacturing, commissioning, metering system inspection, and maintenance.
2. What Does a VT/PT Burden Load Box Actually Do?
A VT burden load box is designed to apply a defined electrical load to a voltage transformer's secondary circuit.
The load may be configured using resistive and reactive elements to obtain the required apparent power and power factor.
Its main functions may include:
Applying a selected secondary burden.
Simulating the load of connected meters and relays.
Checking secondary circuit loading.
Evaluating burden at different load settings.
Supporting VT testing and verification procedures.
Depending on the design, a burden box may provide fixed load steps, adjustable load settings, or multiple selectable burden combinations.
The actual voltage rating, burden range, power factor options, number of phases, and operating frequency must be confirmed from the specific equipment specifications.
3. Understanding the Three Important Burden Parameters
To select and operate a voltage transformer burden load box correctly, engineers need to understand three basic electrical parameters.
3.1 Rated Secondary Voltage
The rated secondary voltage is the voltage specified for the VT secondary winding.
Common secondary voltage arrangements vary by region, transformer design, and application. Examples include 100 V, 110 V, 115 V, 120 V, and phase-to-neutral ratings such as 57.7 V or 63.5 V.
The burden load box must be compatible with the actual secondary voltage being tested.
3.2 Apparent Power (VA)
Burden is expressed in volt-amperes rather than only watts because the secondary load may contain both resistive and reactive components.
For a single-phase circuit:
[
Where:
(S) = apparent power in VA.
(U) = secondary voltage in volts.
(I) = secondary current in amperes.
3.3 Power Factor
Power factor describes the relationship between active power and apparent power.

Where:
(PF) = power factor.
(P) = active power in watts.
(S) = apparent power in volt-amperes.
A resistive load generally has a power factor close to 1.0. A load containing inductive or capacitive components has a different phase relationship between voltage and current.
Power factor matters because a VT's accuracy requirements may be specified at particular burden values and power factors.
4. How Does a Voltage Transformer Burden Load Box Work?
A typical VT burden load box uses internal load elements and switching arrangements to create the required secondary load.
The operating process can be divided into four stages.
Stage 1: Select the Required Burden
The operator selects the target burden according to the VT nameplate, test procedure, and required operating condition.
The selected value may be expressed in VA or as a percentage of rated burden.
Stage 2: Configure the Load
The load box connects the required internal resistive and reactive elements.
The combination determines the apparent power and power factor of the simulated load.
Stage 3: Connect the VT Secondary Circuit
The load box is connected to the appropriate secondary terminals using the specified connection arrangement.
The connection must match the VT's rated secondary voltage and the load box's electrical ratings.
Stage 4: Apply and Verify the Load
After checking the connections and safety conditions, the load is applied.
Where measurement functions are provided, the operator can measure voltage, current, apparent power, and power factor to verify the actual burden.
The test results can then be compared with the required burden conditions.
5. How to Perform a VT Secondary Burden Test
A structured test procedure helps reduce connection errors and makes results easier to compare.
Step 1: Check the VT Nameplate
Before testing, record:
Rated primary voltage.
Rated secondary voltage.
Rated frequency.
Rated output in VA.
Accuracy class.
Number of secondary windings.
Applicable winding or circuit identification.
Each secondary winding should be evaluated according to its own rating and intended application.
Step 2: Review the Existing Secondary Load
Identify the equipment connected to the VT secondary circuit.
This may include meters, protective relays, monitoring instruments, and secondary wiring.
The existing load and cable impedance contribute to the total secondary burden.
Step 3: Select the Test Burden
Choose the required burden and power factor according to the test procedure.
Do not select a load that exceeds the VT secondary winding's rated output unless a specific test procedure explicitly requires it.
Step 4: Connect the Burden Load Box
Connect the load box to the specified VT secondary terminals.
Before applying the load, verify:
Correct terminal identification.
Rated secondary voltage compatibility.
Load box rating.
Wiring and grounding arrangement.
Isolation and safety conditions.
Step 5: Apply the Selected Load
Apply the required burden setting and allow the readings to stabilize.
Where available, measure the actual secondary voltage and current to confirm the applied load.
Step 6: Record the Test Results
A useful test record includes:
VT identification.
Secondary winding identification.
Rated secondary voltage.
Rated burden.
Applied burden.
Power factor.
Measured voltage and current.
Test frequency.
Test date.
Test equipment identification.
The results can be used for secondary circuit assessment and further VT accuracy verification.
6. How Secondary Burden Affects VT Accuracy
The secondary burden affects the voltage transformer operating condition and may influence its voltage ratio error and phase displacement.
A voltage transformer is designed to meet specified accuracy requirements under defined operating conditions.
If the actual connected burden differs significantly from the rated or specified burden, the VT may not operate under the same conditions used for its accuracy classification.
For example:
An excessively high secondary burden may increase voltage drop and affect performance.
An unusually low burden may fall outside the specified accuracy test range for some VT accuracy requirements.
A different power factor can change the burden's electrical characteristics.
Long secondary cables add impedance and contribute to the total burden.
This is why burden verification is relevant to metering and protection applications.
Important distinction: A burden load box can apply or simulate a secondary load. It does not, by itself, measure the VT's ratio error or phase displacement. A complete accuracy test requires suitable voltage transformer calibration or testing equipment.
7. Common Problems Found During VT Secondary Burden Testing
Excessive Secondary Burden
The total connected load may exceed the rated output of the VT secondary winding.
Possible contributors include additional meters, relays, monitoring devices, and long cable runs.
The connected equipment and wiring should be reviewed to identify the source of the excessive burden.
Incorrect Power Factor
The actual secondary load may have a different power factor from the specified test condition.
This can affect the interpretation of VT accuracy results.
A suitable burden load box should be capable of reproducing the required load characteristics.
Incorrect Secondary Voltage Selection
Using a load box with an incompatible voltage rating can produce incorrect test conditions or create an equipment safety risk.
Always verify the rated voltage before connection.
Unbalanced Three-Phase Loading
For three-phase VT systems, unequal secondary loads may cause different operating conditions between phases.
Where phase-by-phase burden testing is required, each circuit should be checked according to the test procedure.
Cable and Connection Effects
Secondary wiring resistance and impedance contribute to the overall burden.
Loose terminals, poor connections, and damaged wiring may also affect measurement stability.
8. How to Choose a Voltage Transformer Burden Load Box
The correct load box should match the VT's secondary characteristics and the intended testing application.
| Selection factor | What to check |
|---|---|
| Rated voltage | Compatibility with the VT secondary voltage |
| Burden range | Minimum and maximum selectable VA |
| Load adjustment | Fixed steps or adjustable burden |
| Power factor | Available resistive and reactive load combinations |
| Phase configuration | Single-phase or three-phase test requirements |
| Frequency | Compatibility with 50 Hz, 60 Hz, or other specified frequencies |
| Measurement capability | Voltage, current, VA, and power factor measurement, if required |
| Operating method | Manual switching or controlled load selection |
| Safety design | Protection, terminals, enclosure, and rated duty |
Fixed or Adjustable Burden Load Box?
A fixed-step load box is suitable when testing requires predefined burden values.
An adjustable load box provides more flexibility when engineers need to simulate different operating conditions.
The best option depends on the test procedures, VT types, and laboratory requirements.
Single-Phase or Three-Phase Configuration?
Single-phase load boxes can be suitable for individual VT secondary winding tests.
Three-phase systems may be more appropriate when the test program involves three-phase secondary circuits and phase-specific load conditions.
The required configuration should be determined before purchasing the equipment.
9. VT Burden Load Box vs. Other Voltage Transformer Testing Equipment
A burden load box is one component of a wider VT testing program.
Different instruments are used to evaluate different characteristics.
| Equipment | Main testing purpose |
|---|---|
| VT Burden Load Box | Simulates or applies secondary electrical burden |
| Voltage Transformer Ratio Tester | Measures voltage transformation ratio and related phase information |
| Instrument Transformer Tester | Supports selected VT/CT electrical performance and accuracy tests |
| AC High Voltage Test System | Performs specified insulation withstand tests |
| Insulation Resistance Tester | Measures insulation resistance |
For a complete VT assessment, engineers may need to combine burden testing with ratio, polarity, insulation, and accuracy measurements.
10. Applicable Standards and Technical References
The selection and testing of voltage transformers should follow the applicable standards and project requirements.
IEC 61869-3
IEC 61869-3 covers additional requirements for inductive voltage transformers.
It addresses rated output, accuracy classes, voltage error, phase displacement, and relevant test conditions.
The specified burden and power factor are important when evaluating VT accuracy.
IEEE C57.13
IEEE C57.13 provides requirements for instrument transformers, including standard burden definitions for voltage transformers.
It identifies standard burden designations with corresponding VA and power factor values.
These standard burden conditions are useful references when specifying and evaluating VT secondary loads.
The applicable standard edition and requirements should be confirmed for the project and transformer type.
11. Goldhome Voltage Transformer Testing Solutions
Goldhome focuses on electrical testing equipment and high-voltage testing solutions for power utilities, instrument transformer manufacturers, engineering contractors, and electrical laboratories.
A voltage transformer burden load box can be selected according to the required secondary voltage, burden range, power factor, phase configuration, and testing procedure.
For projects requiring a more comprehensive VT testing setup, burden testing may be combined with voltage ratio measurement, insulation testing, and other instrument transformer verification procedures.
Visit Goldhome Hipot to learn more about electrical testing equipment and instrument transformer testing solutions.
12. Frequently Asked Questions
What is a voltage transformer burden load box?
It is a test device used to apply a controlled electrical load to a voltage transformer secondary circuit. It simulates the burden created by connected meters, relays, and other equipment.
What does VT burden mean?
VT burden refers to the total electrical load connected to a voltage transformer secondary winding. It is generally expressed in volt-amperes (VA) at a specified power factor.
Why is power factor important in VT burden testing?
Power factor describes the phase relationship between voltage and current in the secondary load. It affects the electrical characteristics of the burden and is relevant to VT accuracy testing conditions.
Can a VT burden load box measure voltage transformer accuracy?
Not by itself. A burden box applies a specified load. Measuring voltage ratio error and phase displacement requires appropriate reference and measurement equipment.
Can a burden load box be used for both CT and VT testing?
The general concept of burden testing applies to both current transformers and voltage transformers, but their secondary circuits and electrical ratings are different. A VT burden box should not be assumed suitable for CT testing unless specifically designed for that purpose.
How do I select the correct VT burden load box?
Check the VT secondary voltage, rated burden, required power factor, phase configuration, operating frequency, and required load adjustment range. These parameters should match the intended test procedure.
Conclusion
A voltage transformer burden load box provides a controlled way to simulate secondary loading conditions and evaluate VT/PT secondary circuits.
By selecting appropriate VA values and power factor conditions, engineers can check whether the secondary circuit operates within the required burden range and identify potential loading problems.
For accurate VT assessment, burden testing should be considered alongside ratio error, phase displacement, insulation, and other relevant electrical tests.